Job #1047
EV charger install · Mon, Aug 3, 1:00 PM–3:00 PM
Customer and property
Type of work
Install a customer-supplied Level 2 EV charger on the garage wall.
Access
Dog will be secured. Use the right-side gate to reach the garage panel.
Service notes
Panel photo shows two open spaces; verify load calculation onsite.
Job files
Assigned
Mon, Aug 3, 1:00 PM
Scheduled
Required for this job
50A GFCI breaker
1 each
Truck: 0 · Buy 1
6/3 NM-B cable
50 ft
Truck: 24 · Buy 26
A supply stop will be included when the route is built.